Archive for 2006/07


Septic System

I met with Dean from the engineering firm Kollaard Associates today to disucss the septic system design.  This has been a somewhat worrisome issue due (vertical) to size requirements.
Conventional wisdom would have us put the footers on existing grade and then backfill around 5 or 6′ around the basement walls.  The septic system’s drainage field […]